Thanks Dave, would you look at the time, its ONE MONTH LEFT O'CLOCK!!!!
OK guys, there's at least 3 of us not posted 'tillered' pics. In theory, everyone needs to be done tillering in the next two weeks at the latest to leave two weeks for finishing-off. So, it should be possible to start shipping in two weeks time, but, life happens. If you need extra time PM me. There is a Reserve bow in-build in case anyone is forced to drop-out at this late stage.
Also, I need to start putting together the Extras Random Draw list, so if anyone has a bow built for the Trade as a Plan B wants to join an Extras Draw I need to know. What do you all think about opening the swap out to the wider PA community?
Andrew