Would you rather want maybe 50-100 4' long tonkin shafts (meant for garden stakes or something), unfinished, unstraightened or maybe 10 or 6 straightened, cut to length and spined? Though it would take a long time. Hopefully could be finished with shellac and tung oil in 11 weeks? though I don't have a spine measurer... and haven't managed to straighten a single shaft yet...
I have way too many of those, and way too many that are garbage to get rid of.
Would like a few pieces of back strap sinew..