Here are 7 Covid staves I have been working on. 3 Birch,2 Elm, 1 hickory, and an Osage that needs sinew backed . The other 6 have been tillered, and shot, but need finished. Staying busy ,and starting to run low on staves. For me not a better way to spend the day. Mostly 8 hour shifts. Trying times. Stay safe. I will be working on getting a couple more to floor tiller today.