Thanks for the comments guys, I guess it is on to finish work on this one!
In the meantime, I got the tips flipped some on the Plan B bow. I will probably have some tillering to do after flipping the tips. And then will heat treat. I have a question, I was planning to adjust tiller after flipping the tips, then heat treat, then adjust tiller. Is this what you guys do, or would you heat treat directly after flipping the tips?
Also, I got one limb heat treated on my Plan D white oak. Here is a picture in the caul. I will do the other limb tomorrow maybe start some of the finishing on the Plan C I just posted.
Michael