When working slabs I much prefer to percussion a slab, so I need slabs that are 3/8 min. to do that, I hate starting with a square edged slab and pressure flaking it. If I am doing that I will fog it.
When I percussion I will bevel one edge all the same direction to set a platform and the skin on side at a time, When that is clear I will go to the other side.