was thinking of working a hide in the rack this afternoon. It was brained and put in the freezer back in the spring and I was wondering if it is possible for the weather to be TOO HOT to work it. Temp in the 90's. My thinking is , as long as I stay on it it should dry fairly quickly. I know back in the spring/winter it always takes me about 4-6 hours to get one right.